Fivalco Vertical Type Large Indicator Post
Field Adjusment
- Remove the top section from the top of the Indicator Post assembly.
- Cut the required length off the bottom of the Stand pipe for the Gound Line to match up with Standpipe Gound Line mark.
- Set the “OPEN” and” SHUT” targets for the appropriate valve size.
- Reattach the Top Section to the top of the Indicator Post assembly.
- Design and dimensions are subject to change without notice.